We welcome potential buyers to contact us.
TIANJIN GOLDENSUN I&E CO.,LTD

Powder Coated Q195 Steel H Frame Scaffolding For Buildings Construction

Short Description:

Scaffold refers to the various supports erected on the construction site for workers to operate and solve vertical and horizontal transportation


  • Min.Order Quantity: 5tons
  • Supply Ability: 5000 tons per Month
  • Delivery Time: 20-40 days after received the deposit.
  • Loading Port: Xingang, China
  • Payment Terms: L/C,T/T
  • Product name: Pre-galvanized H frame scaffolding
  • Model Number: 17*95*180cm
  • Application: Hotel,office building,school,mall,warehouse
  • Weight Capacity: 200kg
  • Product Detail

    Product Tags

    scaffolding 8

    Specification

    item
    value
    Warranty
    1 Year
    Weight Capacity
    200kg
    After-sale Service
    Online technical support, Onsite Installation, Onsite Inspection, Other
    Project Solution Capability
    Others
    Application
    Hotel,office building,school,mall,warehouse
    Design Style
    Modern
    Place of Origin
    China
    Brand Name
    Golden sun
    Model Number
    170*95*180cm
    Material
    Steel
    Feature
    Folding Ladders, Insulation Ladders
    Type
    Domestic Ladders
    Structure
    Ladder Stools
    Product name
    Foldable scaffolding ladder working platform
    Application
    Hotel,office building,school,mall,warehouse
    Color
    silver
    Max load
    200kg
    Materail
    Q195
    Height
    170cm

     

    Precautions for erecting scaffolding

    1. The foundation of H frame scaffolding must be tamped, and drainage slopes should be made to prevent water                accumulation.

    2. The erection sequence of H frame scaffolding is: foundation preparation → placement of backing board → placement  of base → vertical two-sided single-piece door frame → installation of cross bar → installation of scaffolding board →      repeat installation of the door frame, cross bar, and scaffold board on this basis .

    3. Steel pipe scaffold should be erected from one end to the other end, and the upper step scaffold should be completed    after the lower step scaffold is erected. The erection direction is opposite to the next step.

    4. For the erection of scaffolding, first insert the two H frames on the base of the end points, and then install the cross      rods to fix them, lock the lock plates, and then set up the future H frames, and install the cross rods immediately after      each kick. And lock piece.

    5. The scaffolding must be set up to be reliably connected to the building.

     

    Advantage

    1) The geometric dimensions of H frame scaffolding are standardized. 

    2) The structure is reasonable, the force performance is good, the strength of the steel is fully utilized, and the bearing      capacity is high.

    3) Easy assembly and disassembly during construction, high erection efficiency, labor-saving, time-saving, safe,reliable,  and economical.

     


  • Previous:
  • Next:

  • Please leave your company messages, we will contact you soonest.

    Related Products

    WhatsApp Online Chat !